Good workmanship by each trade is not enough; tasks must follow a sequence that prevents one stage from damaging another.
Typical sequence
- Define needs, dimensions and existing problems
- Removal, demolition and hidden-service work
- Electrical and plumbing infrastructure
- Wall-floor preparation and coverings
- Paint and final finishes
- Furniture, lighting and accessory installation
- Testing, touch-ups and cleaning
Common mistakes
Painting before resolving moisture, measuring furniture before final floor levels or changing lighting after a ceiling is closed creates rework.
Benefit of coordination
Planning trades, material deliveries and work areas together reduces waiting and conflict.